CERAMIC PRO™ is a Builder Grade quality, insulating ceramic, interior wall, ceiling and trim paint. It is formulated with ceramic fillers, CERAMIC PRO™ provides insulating and soundproofing values along with a uniform, easy to apply, excellent hiding latex finish.
1 Gallon
#16xx-1
5 Gallon
#16xx-5
55 Gallon
#16xx-55
Pallet
#16xx-36/5
Tote
#16xx-250
CERAMIC PRO™ can be used on most wall, ceiling and trim surfaces such as primed plaster, wallboard, wood, concrete, brick, masonry, primed metal, and well bonded wallpaper and various other substrates. CERAMIC PRO™ is excellent for most residential, commercial and industrial applications.
SURFACE PREPARATION:
PREVIOUSLY PAINTED SURFACES:
Wash off all dirt, grease, soap and oil build-up with a powdered household cleaner and water. Rinse thoroughly. Remove loose paint and powdery substances. Patch cracks and holes with patching paste. Dull any nonporous or glossy surfaces by thorough washing with an abrasive kitchen cleaner or by scuff sanding. Rinse and/or remove any powdery residues. Spot prime patched areas before painting entire wall with CERAMIC PRO™ Paint.
UNPAINTED SURFACES:
Drywall: Fill nail holes and cracks with patching paste. Remove all dirt and loose material. Spot prime patched areas before priming entire wall with CERAMIC PRO™ Primer Sealer, before painting with CERAMIC PRO™ Paint.
Plastered Walls: Surface must be dry, cured and hard. Textured or swirl types and soft porous or powdery plaster must be treated with a solution of one pint household vinegar in one gallon of water. Repeat until surface is hard. Rinse with plain water. Let dry and apply a coat of CERAMIC PRO™ Primer Sealer, before painting with CERAMIC PRO™ Paint.
Metal: Clean surface of all grease, oil and foreign matter before priming. Rusted metal and galvanized metal must be primed with METAL-PRIME RED-OX™, a Red Iron Oxide Primer Sealer, before painting with CERAMIC PRO™ Paint.
Masonry: Prime masonry before painting. New masonry must either be sealed with CHALK-FORCE™ or aged 60 days, before painting with CERAMIC PRO™ Paint.
APPLICATION PROCEDURE:
Stir well before using. Thinning is not recommended but if necessary use water sparingly. Do not apply when temperatures are below 40 degrees Fahrenheit or when humidity is very high. Apply using brush, roller or spray. When rolling, apply in an N pattern first, then cross roll to spread paint, and finish with light roller strokes in downward direction. Always roll or brush from untouched into wet paint areas. Allow at least 4 hours to dry before applying a second coat. Wait at least two weeks before washing the dry paint film.
CLEAN UP:
Clean up all spills, tools and overspray immediately while the coating is still wet with warm soapy water.
Data Sheet - CERAMIC PRO™ Builder Grade Interior Ceramic Paint Datasheet